Water Treatment Works

Water Treatment Works

Project: 1600 m3
Work carried out: Water Treatment Works
Specification: Durus @ 5kg/m3 & 0.91kg/m3 Fibrin X-T
Concrete: RC40

A UK Water Authority needed a rapid and effective solution that removed the logistical problems associated with using traditional steel mesh.

The Contractor needed to minimise labour cost and improve site safety whilst also meeting WRAS (Water Regulations Advisory Scheme).

After the engineer approved our design Durus enhanced concrete was placed inside a covered water tank. The Concrete containing Durus removed the need for steel mesh on the site which meant that manual handling issues were also removed providing a faster building technique.

 